Construction for the new Performing Arts Center is slated to begin in early January 2023.
We are excited to get construction underway. However, there is a need to change the traffic flow onto and off of campus because the front traffic loop will not be accessible. In addition, the outside doors to the main office area will not be accessible during the construction period.
We apologize for the inconvenience, but are looking forward to the new Performing Arts Center for our students and patrons!
Here are details about the traffic flow change:
- The front entry to the building will no longer be at the current Main Office area. Instead, the front entry for students and visitors will be at the set of doors located just south of the traditional Main Office entry.
- Access to the limited front parking lot and the newly located front office area will be closed to all patrons before 7:25 a.m. each day until student drop-off is complete.
- Traffic flow expectations for parents and students can be found in the diagram below.
- Both before and after school, student drivers will need to access the school and/or parking lot through the parent drop-off line. Please anticipate school personnel to be available to stop traffic to provide periodic student crosswalk points.